Home / Browse Categories / Results / Creating Your Own Graphs

 Creating Your Own Graphs

There are many graphs in SIMUL8 that you can access at the click of a button. But what if there is a result unique to you that you want to display? You could export the data to an Excel or an internal spreadsheet and graph it that way. But using Display+ you could draw your own graph on screen and have it update as the run progresses. Here's how.

What is Display+?

Display + was added to SIMUL8 in Release 7. Its a group of visual logic commands that give you total control over the visual display of your simulation. The commands are:

Display Image
Places an image from the Image Library onto the simulation window or a sub-window, at location X, Y. and automatically deletes any image at the same X and Y location to prevent lots of images getting placed on top of each other

Display Image Without Clear
Places an image from the Image Library onto the simulation window or a sub-window, at location X, Y. This command won't delete any image currently at the X and Y location, so images can be layered on top of each other.

Display Text Parameters
Creates a text box and places it on the simulation window or a, at location X, Y and automatically deletes any image at the same x and Y location.

Display Text Without Clear
Creates a text box and places it on the simulation window or a sub-window, at location X, Y but won't delete any text at the same location, so the text can be layered on top of existing text.

Clear all Display+
Deletes all text and images that have been created using Display+

Clear Image
Deletes the image at location X, Y.

Clear Text
Clears a text box at location X, Y on the nominated Window.

Because its done through visual logic the image changes can be event or time driven. So for example you could have text appear whenever a shift change occurs or when stock levels fall below a certain level, or draw a graph of your results as the simulation is running....

Drawing Your Graph

Drawing a graph with Display+ is really easy. There are 4 steps that are looped through continuously.

  1. Get the result to be graphed
  2. Draw your X and Y axis
  3. Draw your data point
  4. Move forward one step on the X axis

As an example we'll discuss how you go about creating the bar chart below, but the same principal applies to creating any type of graph. You can also download the example simulation to see the code in action.

Above is the code used to generate the graph.

Step 1: Get the Result to be Graphed

In this case we're graphing the processing time for each work item. We have used a label, L_Elapsed Time, to store the time the work item entered Work Center 1. We subtract this from the simulation time the work item exits at to get the process time we want to graph.

Display+ can only put images at whole pixel locations so we use the Round function to set it to the nearest whole number. There won't be much difference between the data points we have to graph so we also multiply the result by 12 to make the difference between the points we're graphing bigger and hence the graph easier to read.

Step 2: Draw Your X and Y Axis

The first loop in the code draws the X axis and the grid lines at 5,10,15 and 20 minutes. This is done by drawing a small red dot each time a work item is processed, the dots then join up to create the lines.

In this case we know approximately what the Y axis will be so we've drawn this on screen using the standard drawing objects. You could of course just draw your X on screen as well but this means you could end up with an axis that is too long or too short as the number of work items processed will vary a lot depending on the length of the run.

Step 3: Draw Your Data Point

Depending on the type of graph you're drawing the exact steps you have to go through at this stage will be different. As we're drawing a bar chart here we use a loop to draw a dot at the data point and then another dot each pixel down until we get to the zero axis. The key thing to remember here is that the (0,0) coordinate for the Display Image command is at the top left hand corner of the screen so you're drawing from the top down rather than from the axis up.

Step 4: Move Forward One Step on the X Axis

So that you don't keep drawing over the same data point you need to use a variable to store which point you're at on the X axis. Then when you've drawn each data point increment this variable so the next point drawn is a few pixels to the right.

Tips

- If you're going to display the graph in a sub-window decide on the name of it before you start coding. If you change you're mind you'll have to change every "Display Image" command that references the sub window.

- Once you've got your axis etc. placed in the exact location you require turn off the Graphics toolbar. This prevents any of the onscreen graphics from being edited or changed, so they'll effectively be locked to the location you've placed them at.

- To help you find the exact pixel location you want to place the images at drop an object on screen then use Quick View to look up the pixel location of your object. This saves a lot of fiddling about.

- While you're figuring out the pixel location you want to place the images at you'll probably drop lots of images on screen. To get rid of them quickly select TOOLS > VISUAL LOGIC EVENTS > SERVICES > CLEAR ALL DISPLAY+ from the main toolbar.

Download the Simulation

Download the example simulation discussed in this newsletter. When you're up to speed with this example try looking at this slightly more complicated version.

Attachment Files:
CreateYourOwnGraphBasic.zip
Attachment Files:
CreateYourOwnGraphComplicated.zip


Powered by SocketKB version 1.0.7
Copyright © 2004 Creative Digital Resources Sdn Bhd. All rights reserved.
 
| Home | About | Products | Solutions | Support | Purchase | Partners | Contact | Sitemap | Search | Privacy Policy |